亚洲色欲色欲www,国产精品29页,国产一起射在线视频,亚洲成色在线综合网站,清清草视频在线,国产一区二区精品久久,国产成人精品日本亚洲18图

[sort:name]

News

current location:Home >> News >> Industry News
Company News Industry News

How to install graphite packing?

Time:2015-11-21 Page View:0

1. Removing old packing and inspecting the packing box is a key aspect of early installation preparation.

2. Before filling, remove all the old filling materials with special tools and wipe the filling box clean.

3. Observe whether there are defects such as damage, eccentricity, etc. in various parts of the packing box. Damaged valve stems, shaft sleeves, and packing boxes can all affect the performance of the packing.

4. Check if other components are still applicable. Replace all damaged parts.

5. Adjust whether the bearings are concentric. If they are not concentric, they need to be adjusted or replaced.

6. Check if the water pump or mixing kettle is vibrating and adjust it to a stable operating state.


TEL:13956251648 / 0562-6863868

Email:1350780210@qq.com

Address:Tongjing East Road, Yi'an District, Tongling City, Anhui Province

Copyright ? 2023-2024 Tongling Jinli Electronics Co., Ltd       sitemap    technical support:Chengguang Network   

訪問(wèn)手機(jī)站 scan
Visit mobile website
13956251648
Tel
手機(jī)站 Scan